CONFERENCE PROCEEDINGS
7th INTERNATIONAL CONFERENCE
CONTEMPORARY ACHIEVEMENTS IN CIVIL ENGINEERING 2019 , 2019.y., pp. 587-596
PERFORMANCE-BASED ROAD MAINTENANCE -DURATION OF CONTRACT AND IMPLEMENTATION STRATEGY |
|
DOI: 10.14415/konferencijaGFS2019.054 |
UDC: 625.76 |
CC-BY-SA 4.0 license |
Author : Jokanović, Igor; Zeljić, Dragana; Svilar, Mila |
|
| Summary: |
| Within the past 20 years there has been a shift in implementing contracted
road maintenance through the use of performance-based methods. In most developed
countries, performance- or output-based contracting of road maintenance operations
has been effective, where appropriate conditions and institutional settings have been in
place. It requires careful preparation in order to create a contract that is balanced and
feasible, providing an adequate incentive for private sector participation. The paper
presents the discussion and advice on the duration of such contracts, as well as on the
long-term strategy to implement these. |
|
| Keywords: |
| roads, performance-based maintenance, contract, strategy |
|
|
|