CONFERENCE PROCEEDINGS
6th INTERNATIONAL CONFERENCE
CONTEMPORARY ACHIEVEMENTS IN CIVIL ENGINEERING 2018 , 2018.y., pp. 727-733
METHOD IN PLANNING CONSTRUCTION MACHINERY REPLACEMENT| |
 |
| DOI: 10.14415/konferencijaGFS2018.071 |
| UDC: 69.057.7 |
| CC-BY-SA 4.0 license |
| Author : Petronijević, Predrag; Arizanović, Dragan; Ivanišević, Nenad; Petrović, Marija |
| |
| | Summary: |
| | One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies replacement at a given time is
the magnitude of operating costs. This analysis will show a method for replacement
planning and sale of machines in a future time period. |
| |
| | Keywords: |
| | construction machinery, costs, machine replacement. |
| |
| |
| |