CONFERENCE PROCEEDINGS INTERNATIONAL CONFERENCE"CONTEMPORARY ACHIEVEMENTS IN CIVIL ENGINEERING 2015 "FACULTY OF CIVIL ENGINEERING SUBOTICA , 2015.y., pp. 451-457
ACCURACY OF CUTTING THE TUNNEL "MALA KAPELA" IN CROATIA |
 |
DOI: 10.14415/konferencijaGFS 2015.057 |
UDC: 624.19.035.2(497.5) |
CC-BY-SA 4.0 license |
Author : Zrinjski, Mladen; Barković, Đuro; Majcan, Tomislav |
|
| Summary: |
| The tunnel "Mala Kapela", 5760 m long, is the longest tunnel in the Republic
of Croatia. The transverse deviation for the cutting point in the right tunnel tube was sQ=0.8 cm and the longitudinal deviation sL=2.1 cm. The transverse deviation for the cutting point in the left tunnel tube was sQ=1.0 cm and the longitudinal deviation sL=2.2 cm. The vertical deviation for the cutting point in the right tunnel tube was sH=1.9 cm, and for the cutting point in the left tunnel tube sH=2.1 cm. |
|
| Keywords: |
| Overhead geodetic basis, underground geodetic basis, transverse deviation, longitudinal deviation, vertical deviation |
|
|
|