Journal of
Faculty of Civil Engineering


JOURNALS
FACULTY JOURNALS
SCIENTIFIC MEETINGS
EBOOKS
ARCHIVE








CONFERENCE PROCEEDINGS
8th INTERNATIONAL CONFERENCE
CONTEMPORARY ACHIEVEMENTS IN CIVIL ENGINEERING 2021 , 2021.y., pp. 249-254


DESIGN AND CONSTRUCTION OF SMALL HYDRO POWER PLANTS ON THE NISAVA RIVER
 
DOI: 10.14415/konferencijaGFS2021.23
UDC: 627.8(497.11)
CC-BY-SA 4.0 license
Author : Letica, Vicko
 
 Summary:
 Gravity concrete, fill Dams and appurtenant structures are located on Nisava River. Small HPP “Vrgudinac” and HPP “Crveni breg”, are a run-of-river-plant with dam constructed at the river bed and the power house located at the river bank. The maximum heights of the dams are 13.00 m and 13.70 m. The maximum water head, with closed gates, is 4.60 m. Both HPPs were put into the operation in the period from 2017 to 2019. As far as it is known, these are the first private HPP in Serbia, built in Serbia after the Second World War.
 
 Keywords:
 dam, hydropower plant, concrete, levee, construction.