CONFERENCE PROCEEDINGS
8th INTERNATIONAL CONFERENCE
CONTEMPORARY ACHIEVEMENTS IN CIVIL ENGINEERING 2021 , 2021.y., pp. 241-247
THE SECOND STAGE SANATION OF THE LEFT SIDE OF THE BAJINA BASTA DAM |
|
DOI: 10.14415/konferencijaGFS2021.22 |
UDC: 627.824.7(497.11) |
CC-BY-SA 4.0 license |
Author : Letica, Vicko; Danilović, Vladimir |
|
| Summary: |
| The Bajina Basta Dam is a hollow gravity dam. It was completed in 1966. In the previous period, due to the occurrence of cracked systems, the Project to repair the left side of the dam was made in 1992. The first phase of rehabilitation was completed in 2006. However, tangential displacements do not have a tendency of stopping. For that particular reason, an additional analysis of the problem of the dam was performed. The second phase of repair refers to blocks No.19 and No.20. |
|
| Keywords: |
| hollow gravity dam, repair |
|
|
|