JOURNAL OF FACULTY OF CIVIL ENGINEERING 21, 2012.y., pp. 167-172
GEOTECHNICALINVESTIGATIONTOSHARE OIL PIPELINE FROM BROD TERMINALTO THE EXTENTOFTHE SAVA RIVER| |
 |
| UDC: 621.643:665.61:550.82 |
| CC-BY-SA 4.0 license |
| Author : Neđo Đurić |
| |
| | Summary: |
| | Activatingoil refineryin Brod,openspace forits connectionswith theSlavonski
Brodregionaloil pipelinein Croatia.Forthis purposeit is necessary toreconstructthe
existingoil pipeline, to supplementusein transportingpetroleum products.For this
purpose, certain geotechnicalfield research anddefined the conditionsof excavation
andbackfillingthe trench. |
| |
| | Keywords: |
| | Oil pipeline, geotechnical investigations, geotechnical conditions, trench
excavation |
| |
| |
| |