Journal of
Faculty of Civil Engineering


JOURNALS
FACULTY JOURNALS
SCIENTIFIC MEETINGS
EBOOKS
ARCHIVE








CONFERENCE PROCEEDINGS
7th INTERNATIONAL CONFERENCE
CONTEMPORARY ACHIEVEMENTS IN CIVIL ENGINEERING 2019 , 2019.y., pp. 219-227


REINFORCEMENT OF ROOF STRUCTURE OF OLD AND NEW HALL WITH SPATIAL STEEL STRUCTURE – BRIDGE
 
DOI: 10.14415/konferencijaGFS2019.018
UDC: 692.426:624.014.2
CC-BY-SA 4.0 license
Author : Bešević, Miroslav T.; Gajić, Milan; Aleksandar, Prokić; Kuburić, Miroslav; Lukić, Ilija
 
 Summary:
 For the needs of expansion of the existing industrial complex and uninterrupted technological process of production, it was necessary to design a supporting spatial construction - bridge for the construction of the roof structure of the existing and newly constructed halls. The existing construction of the hall relies on the construction of the bridge to the left for the removal of facade columns. In addition to the existing hall on the right side of the bridge construction, a new hall of the roof ties range is added l = 43.0m. Instead of the main bearing pillars in the façade plane, the main lattice carriers-relays rely on a newly-designed spatial construction-bridge. Bridge steel structure is located between the old and the new hall and thus fully connects the unobstructed technological process in the complex of existing and new halls. In static terms, the spatial steel construction is a simple beam of different ranges () mounted over three fields, which are administratively mounted on the transversal roof hinges-carriers of the hall.The foundation of the bridges' construction is designed in the form of the foundation of the male at the end supports and at two places within the bridge. The mentioned complex of the hall is located near the city of Salzburg in Austria.
 
 Keywords:
 capture, shooting, steel construction, mounting attachments, bridge.