CONTEMPORARY ACHIEVEMENTS IN CIVIL ENGINEERING 2016 , 2016.y., pp. 1027-1036


PRODUCTIVITY NORMS FOR MAKING DYNAMIC PLANS UNDER UNCERTAINTY
 
DOI: 10.14415/konferencijaGFS 2016.104
UDC: 65.01 : 69.05
CC-BY-SA 4.0 license
Author : Beljaković, Dejan; Milajić, Aleksandar
 
 Summary:
 Critical Path Method is a vital tool for the planning and control of complex projects. The successful implementation of this method requires availability of a clearly defined duration for each activity. However, due to the long duration of the construction and risks that accompany this process, it is often very difficult or almost impossible to accurately predict the duration of an activity, and consequently to take it for granted that the given activity will be finished on the very same day that is given in the dynamic plan of construction. The aim of this research was to establish new productivity norms for construction works for planing under uncertainty.
 
 Keywords:
 Critical Path Method, productivity norms, dynamic plans, uncertainty