THE SECOND STAGE SANATION OF THE LEFT SIDE OF THE BAJINA BASTA DAM
 
DOI: 10.14415/konferencijaGFS2021.22
UDK: 627.824.7(497.11)
CC-BY-SA 4.0 license
Аутор : Летица, Вицко; Даниловић, Владимир
 
 Резиме:
 The Bajina Basta Dam is a hollow gravity dam. It was completed in 1966. In the previous period, due to the occurrence of cracked systems, the Project to repair the left side of the dam was made in 1992. The first phase of rehabilitation was completed in 2006. However, tangential displacements do not have a tendency of stopping. For that particular reason, an additional analysis of the problem of the dam was performed. The second phase of repair refers to blocks No.19 and No.20.
 
 Кључне речи:
 hollow gravity dam, repair